WORK ORDER No. 10: SATELLITE 1 AND RELATED INFRASTRUCTURE

Summary of Work:

The Satellite Concourse 1 Project is a new remote concourse facility located adjacent and south of existing Concourse C within the airport operations area. This new 19-gate facility is comprised of approximately 560,000 square feet over multiple levels.  The building is a structural steel and concrete superstructure. The project further includes the construction of portions of an underground concrete tunnel connecting future facilities and additionally includes apron paving and other utility and facility improvements.

Prequalification:

Currently Open

Trade Package No.

01

02

03

04

05

06

07

08

09

10

11

12

13

14

Trade Package Description

Site Preparation

Hydronic Piping

Concrete Vault

MCP – Site Preparation

Utilities – Stormwater & Sanitary Sewer

Utilities – Ductbanks

Satellite 1 – ERS

Satellite 1 – Deep Foundations

MCP – Building & Site Improvement

MCP – Mechanical

MCP – Electrical

Airfield Paving

Satellite 1 – Excavation

Satellite 1 – Curtainwall

Status

Step 3

Step 3

Step 3

Step 2

Step 2

Step 2

Step 2

Step 2

Step 2

Step 2

Step 2

Step 2

Step 2

Step 2

WORK ORDER No. 9: AIRFIELD BASINS MODIFICATIONS & TEMP TAXIWAY CLOSURE TAP ENABLING CRITCAL PATH SCOPE PROJECTS

Summary of Work:

These projects will eliminate the Central Detention Basin while expanding the South Detention Basin, which are both required in order to commence construction of the Terminal Area Program (TAP) Satellite #1 and #2 Concourses.

Awarded Subcontractors

Trade Package No.

1

2

3

4

5

Trade Package Description

Central Detention Basin Mass Grading

Taxiway Foxtrot Interim Closure

South Detention Basin Slurry Wall Expansion

South Detention Basin Grout Curtain Expansion

Basin Improvements and Taxiway Paving

Awarded Subcontractor

Walsh Construction Company II, LLC.

Cancelled

Cancelled

Cancelled

Cancelled

WORK ORDER No. 2: RUNWAY 4R-22L REHABILITATION

Summary of Work:

This project consists of pavement rehabilitation of Runway 4R-22L, portions of Taxiway Y and other airfield infrastructure in the southwest quadrant of the airfield.

Awarded Subcontractors

Trade Package No.

1

2

3

4

5

6

Trade Package Description

Asphalt

Electrical

Pavement Marketing

Landscaping

Sweeping

Flagging & Barricades

Awarded Subcontractor

Plote Construction, Inc.

Aldridge Electric, Inc.

Included with Trade Package No. 1

Natural Creations Landscaping, Inc.

Gayton Enterprises, LLC

Air & Wellness Safety Training Company

WORK ORDER No. 4: ELEVATED PARKING STRUCTURE (EPS) RESTORATION

Summary of Work:

This restoration project will take place in multiple phases to fix areas of deterioration, leaking and corrosion to the elevated parking structure during garage operation.

Awarded Subcontractors

Trade Package No.

1

2

3

4

5

Trade Package Description

Concrete Repairs

Expansion Joint Seal Replacement

Waterproofing & Sealer

Spandrel Repair & Misc. Steel

Pavement Markings & Striping

Awarded Subcontractor

Golf Acquisition Group, LLC

Golf Acquisition Group, LLC

Golf Acquisition Group, LLC

Cancelled

Golf Acquisition Group, LLC

WORK ORDER No. 3: LOWER LEVEL UTILITY & PAVEMENT RECONSTRUCTION (LLUPR)

Summary of Work:

The concrete sidewalk accessibility improvements at the arrivals area in compliance with ADA requirements within the terminal core area.

Awarded Subcontractors

Trade Package No.

1

2A

2B

3

4

5

6

7

8

9

10

Trade Package Description

Concrete Sidewalk Replacement

Jack and Bore Pits

Jack and Bore Pits

Traffic Control

Erosion Control

Utilities – Area A

Utilities – Area B

Utilities – Area C/D

Utilities – Area E

Landscaping

Grouting

Awarded Subcontractor

Antigua, Inc.

Reyes Group, Ltd.

Rossi Contractors, Inc.

Air & Wellness Safety Training Company

Sumit Construction Co., Inc.

Reyes Group, Ltd.

Rossi Contractors, Inc.

Rossi Contractors, Inc.

Rossi Contractors, Inc.

Cancelled

Cancelled

WORK ORDER No. 6: TERMINAL 5 LANDSIDE PARKING IMPROVEMENTS

Summary of Work:

Removal and relocation of existing utilities in conflict with the future parking garage structure.  Utilities to be relocated include ComEd ductbank and water main.

Awarded Subcontractors

Trade Package No.

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

Trade Package Description

Electrical 1 & 3

Electrical 2 & 4

Water Main Relocation

Asphalt Restoration

Landscaping & Erosion Control

Structural Demolition

Site Demolition

Deep Foundation

Elevators & Escalators

Temporary Walkway

Cast in Place Concrete

Mechanical

Electrical

Plumbing

Fire Suppression

Metal Panels / Curtainwalls / Glazing

General Trades

Exit Plaza

ERS, Modular Block Retaining Wall & Sitework

Site Utilities

Asphalt, Pavement Markings & Traffic Signage

Landscaping

General Trades

Site Paving, Furnishings, Sidewalks, Signage and Landscaping

Awarded Subcontractor

Aldridge Electrical, Inc.

Aldridge Electrical, Inc.

Reyes Group, Ltd.

Sanchez Paving Company, Inc.

Twin Oaks Landscaping

Alpine Demolition Services, Inc.

John Keno and Company, Inc.

Stalworth Underground LLC

Otis Elevator Company

Blinderman Construction Co., Inc.

F.H. Paschen, S.N. Nielsen & Associates LLC

Ochoa Mechanical Group, LLC

Connelly Electric Co.

Great Lakes Plumbing & Heating Co.

Great Lakes Plumbing & Heating Co.

Crown Corr, Inc.

Cancelled

Burling Builders, Inc.

John Keno and Company, Inc.

Reyes Group, Ltd.

Cancelled

Cancelled

Accel Construction Services Group, LLC

Plote Construction Inc.